University of Alabama Freshman Residence Hall

PROJECT DESCRIPTION

Install HVAC, plumbing, and mechanical systems at new five-story 154,600 square foot residence hall for incoming freshman at the University of Alabama.

PROJECT AT A GLANCE

Location: Tuscaloosa, Alabama
General Contractor: Caddell Construction Company, LLC
Completion Date: July 2018
Project Budget: $9.23 Million

SPECIFICATIONS:
  • Pipe loop and AC units in the attic space
  • Four large central station AHUs (2-with energy recovery wheels)
  • Six smaller AC units serving larger dorm rooms
  • 255 dorm room closet AC units
  • Six ductless mini splits
  • Two air cooled chiller 196 tons each
  • Two natural gas fired boilers 2,175 MBH each
  • Eight pumps
  • 78 HW VAV boxes, four-pipe system, and ductwork
  • Plumbing sanitary waste & vent, natural gas, underground
  • 1,019 plumbing fixtures and equipment