University of Alabama Bryant Denny Stadium

PROJECT DESCRIPTION

UA Bryant Denny Stadium Renovations & Additions selective demolition and expansion of the existing Bryant Denny Stadium including upgrades to existing multi-floor box seating and new multi-floor box seating.

PROJECT AT A GLANCE

Location: Tuscaloosa, Alabama
General Contractor: Caddell Construction Company, LLC
Completion Date: August 2020
Project Budget: $17.45 Million

SPECIFICATIONS:
  • Selective demolition and expansion of Bryant Denny Stadium
  • Upgrades to existing multi-floor box seating
  • New multi-floor box seating
  • HVAC work included tie into existing campus chilled water system and new heating water system routed throughout area including new equipment
  • Four new 2,000 MBH gas fired boilers
  • Four HHW pumps
  • Two CHW pumps
  • One RTU
  • 19 four-pipe AHUs
  • 66 four-pipe FCUs
  • Three refrigerant ductless split system units
  • 55 HW air terminal units
  • 39 exhaust fans
  • Piping, ductwork, insulation, controls, test & balance, and commissioning
  • BIM drawings
  • Plumbing work included tie into existing sanitary, storm, and water system with new equipment
  • 485 fixtures
  • 126 kitchen connections
  • Two 2000 MBH gas fire water heaters
  • One 1,500 gallon HW storage tank
  • New storm, sanitary, domestic water piping, and insulation