New Vestavia Hills Middle School

PROJECT DESCRIPTION

Complete HVAC renovation of existing 170,500 square foot old Berry High School to repurpose the facility as the new Vestavia Hills Middle School.

PROJECT AT A GLANCE

Location: Vestavia Hills, Alabama
General Contractor: Blalock Building Company, LLC
Completion Date: August 2019
Project Budget: $7.326 Million

SPECIFICATIONS:

Date Completed                              August 2019

Project Category                             Institutional (K-12)

Project Size                                    $7,326,000.00

Scope:

  • Demolition of  existing cooling towers, pumps, boilers, and water source heat pump systems and piping
  • New systems include 17 new VRF heat pumps and branch controllers
  • 132 New VRF indoor units, 14 rooftop ERUs, three rooftop OSAs, 16packaged RTUs, 17 mini-splits, 183 air purification units
  • One MAU, new ductwork, refrigerant piping, drain piping.
  • Demolition of existing piping and fixtures
  • 350 new fixtures
  • New gas piping
  • Acid waste piping
  • Domestic water piping
  • Waste & vent piping, and storm piping.