PROJECT DESCRIPTION
Complete HVAC renovation of existing 170,500 square foot old Berry High School to repurpose the facility as the new Vestavia Hills Middle School.
PROJECT AT A GLANCE
Location: Vestavia Hills, Alabama
General Contractor: Blalock Building Company, LLC
Completion Date: August 2019
Project Budget: $7.326 Million
SPECIFICATIONS:
Date Completed August 2019
Project Category Institutional (K-12)
Project Size $7,326,000.00
Scope:
- Demolition of existing cooling towers, pumps, boilers, and water source heat pump systems and piping
- New systems include 17 new VRF heat pumps and branch controllers
- 132 New VRF indoor units, 14 rooftop ERUs, three rooftop OSAs, 16packaged RTUs, 17 mini-splits, 183 air purification units
- One MAU, new ductwork, refrigerant piping, drain piping.
- Demolition of existing piping and fixtures
- 350 new fixtures
- New gas piping
- Acid waste piping
- Domestic water piping
- Waste & vent piping, and storm piping.