Lockheed Martin MAB4

PROJECT DESCRIPTION

HVAC, plumbing and mechanical systems installation at new 62,000 square foot facility assembly building compliant with industry specifications for controlled space.

PROJECT AT A GLANCE

Location: Courtland, Alabama
General Contractor: Hensel Phelps Construction Co
Completion Date: April 2022
Project Budget: $3.06 Million

SPECIFICATIONS:
  • Compliant with IDC 705 specifications for controlled space
  • HVAC work includes one 130 ton & one 35 ton air cooled chillers with pump package
  • Two 952 MBH output gas fired HW boilers
  • Two HW pumps
  • 14 HW VAV boxes
  • Two cooling/heating FCUs
  • Five humidifiers
  • One 3,000 cfm ERV
  • Three cooling/heating AHUs
  • Two split system units
  • CHW/HHW piping
  • Refrigerant piping
  • Approximately 86,000 lbs. ductwork
  • Plumbing work includes 52 fixtures, one 120-gallon gas water heater, three large air compressors with associated equipment trim
  • Reverse osmosis system
  • Sanitary, domestic water, and compressed air piping