VAMC Superheater

PROJECT DESCRIPTION

Provide connection to a central steam plant for a hospital facility.

PROJECT AT A GLANCE

Location: Birmingham, Alabama
General Contractor: Coburn Contractors, LLC
Completion Date: April 2013
Project Budget: $342,400

SPECIFICATIONS:
  • Install 8″ super-heated high pressure steam piping to a new pressure reducing station
  • De-superheater to saturate the steam from the new UAB Steam Plant to the required hospital pressure and temperature requirements
  • Modify the existing condensate return tanks
  • Piping and installing two new return pumps
  • Piping to pump the return back to the Steam Plant.