PROJECT DESCRIPTION
Provide connection to a central steam plant for a hospital facility.
PROJECT AT A GLANCE
Location: Birmingham, Alabama
General Contractor: Coburn Contractors, LLC
Completion Date: April 2013
Project Budget: $342,400
SPECIFICATIONS:
- Install 8″ super-heated high pressure steam piping to a new pressure reducing station
- De-superheater to saturate the steam from the new UAB Steam Plant to the required hospital pressure and temperature requirements
- Modify the existing condensate return tanks
- Piping and installing two new return pumps
- Piping to pump the return back to the Steam Plant.